Hi Farhan
Are you saying no production overhead in the material which is subcontracted?
If yes, go to valuation variant where you assign Costing Sheet. I think you have an option there to apply overheads on Sub contracted material. If not there, check the Tab in Valuation Varisnt for Sub Contracting
Ajay M