Dear Dapo,
The system works correctly regarding to your customizing.
The shelf life is 365 days, if a material is created at 24.04.2016 + 365 days then the batch is valid until 24.04.2017.
Additionaly you defined "Min. Rem. Shelf Life" 360 days. This mean,
if a batch is used in goods movement, then it must hav min 360 days
shelf life.
So 24.04.2017 - 360 days mean the batch can be used in goods movements
until 29.04.2016.
If we try to post today a goods movement later than this date, you will get the error. You had fill in an invalid minimum remaining self life date.
The minimum remaining Shelf Life means the time for which the material must keep
upon goods receipt for the goods receipt to be accepted by the system.
Therefore, please check if the ’Remaining shelf life date’ entry is valid in your PO which allow you to post the GR.
Best Regards,
ian Wong Loke Foong