Can I also check if the plant should be 1000 in step 6?
6. Run DP90 to add sub-item for billing in repair order. The item category is IRIN. I noted that the lines added are under plant 1000 which belongs to company 1000.
Thanks
SF
Can I also check if the plant should be 1000 in step 6?
6. Run DP90 to add sub-item for billing in repair order. The item category is IRIN. I noted that the lines added are under plant 1000 which belongs to company 1000.
Thanks
SF