Hi Pratik ,
follow the below steps :
1) mantain QM view for the material in tr code MM02.
2) Then select the QM proc active box and post to Insp Stock box.
3) Input a control key ( ex - 0000 ) and then select the tab " Insp. setup ' it will take you to a new tab. If you want a QC certificate at the time of reciept then set the control key accirdingly or create a Zcontrol key with necessary changes.
4) Then click on cretae Inspection tab,
5) Then mantain inspection type as 01 and click on detailed tab as shown in figure below
6) Then save it.
7) Create a Inspection plan with tr code QP01 with
Steps to create a inspection plan ;
- go to tr code QP01 , input material no and plant . press enter.then a new window opens
- Then input the values as shown in below picture.
8) then save it.
9) For creating a purchase order use tr code - ME21N ( proc type should be F or X ).
10 ) Do goods Reciept with tr code MIGO . A inspection lot will be generated.
11) Go to tr code MMBE , the stock is showing as QM stock.
12) then go to tr code QE51N and do the Results recording work list.
13) complete the UD with tr code QA11.
If found anything wrong then let me know.
Thanks
Subhrant