Hi Frederic,
Does that apply even if the ECC upgrade pre-processing is going on in a shadow instance.
This will result in a longer downtime for BI/HANA environment.
Thanks
Mrityunjay.
Hi Frederic,
Does that apply even if the ECC upgrade pre-processing is going on in a shadow instance.
This will result in a longer downtime for BI/HANA environment.
Thanks
Mrityunjay.